Sign In | Join Free | My ccnmag.com
China Hangzhou Suntech Machinery Co, Ltd logo
Hangzhou Suntech Machinery Co, Ltd
Specialized In Wire&tube industrial equipment Succeed in Turn-Key Production Line
Verified Supplier

5 Years

Home > Electroplating Machine >

Steel Hard Chrome Plating Machine 0.2um Coating Thickness

Hangzhou Suntech Machinery Co, Ltd
Trust Seal
Verified Supplier
Credit Check
Supplier Assessment
Contact Now

Steel Hard Chrome Plating Machine 0.2um Coating Thickness

Brand Name : SUNTECH

Certification : DDG

Place of Origin : CHINA

MOQ : 1 set

Price : USD 10000~305000/SET

Payment Terms : L/C, T/T

Supply Ability : 30 sets per 4 months

Delivery Time : 2~4 months

Packaging Details : pallets

material : steel

coating type : chrome

coating thickness : >0.2μm

capacity : according to customer

Contact Now

1. Technological process of production

Blank inspection → racking → chemical degreasing → water washing → electrolytic degreasing → water washing → Anodizing (in chromium plating bath) → chromium electroplating → recycling → water washing → put down → water washing → drying → inspection → hydrogen removal → packaging

2. Main process introduction

Chemical degreasing:remove the oil on the surface of products

Electrolytic degreasing: further remove the oil on the surface of products to ensure the binding force of the coating .

Pickling: remove the oxide from the surface of products and activate the product surface .

Water rinsing: clean the product thoroughly after the tank to avoid mutual contamination of the tank.

Anodizing:Let the surface of the steel substrate be in an activated state and produce micro rough surfaces, and then proceed with plating. Ensure obtaining a hard chromium coating with good adhesion.

Chrome plating: the product is coated with a uniform coating.

Hydrogen removal:reduce the brittleness of chromium plating and clean the hydrogen embrittlement of the base metal.

3.Photos

4. Solution preparation

Anodizing: DK 30~50 A/dm2

Time 0.5~3mins

Chrome plating solution: Cr2O3 200~250 g/L
H2SO4 2.0~3.2 g/L
Cr3+ 25-35 g/L
Additives 16-20 ml/L

Temperature 55~65 ℃

DK 30~50 A/dm2

Hydrogen removal: Temperature 200~230 ℃

Time 2~4hours

5.Common faults and solutions

Common faults Cause of occurrence Solution
Insufficient thickness Insufficient power supply Increase power consumption
Low current efficiency Adjusting plating solution and process parameters
The coating is corrugated and cracked There is stress on the surface of the part Improving the surface machining quality before plating
Heat treatment to eliminate surface stress
Surface burrs High current density Reduce current density
Surface peeling and pitting Inadequate pre-treatment Strengthen pre-treatment

6.Packaging & Shipping

We can pack it by pallet, or according to the customers' specific requirements.

Port: Shanghai/Ningbo

7. Our Services
In order to guarantee the customers are able fully to operate the machine, if the customer need, we can help customer training, includes:
(1) Correct operating mode
(2) Correct maintenance way
(3) Correct technological process control
(4) Remove simple problem
All the electroplating machine of our company have already been widely used in electroplating area.

Any doubt please contact us.


Product Tags:

Steel Hard Chrome Plating Machine

      

0.2um Hard Chrome Plating Machine

      
China Steel Hard Chrome Plating Machine 0.2um Coating Thickness wholesale

Steel Hard Chrome Plating Machine 0.2um Coating Thickness Images

Inquiry Cart 0
Send your message to this supplier
 
*From:
*To: Hangzhou Suntech Machinery Co, Ltd
*Subject:
*Message:
Characters Remaining: (0/3000)